Back to Explore
TASK
Fence Erectors
ID
work_construction/fence_erectors
Type
TASK
Children
20
Child Nodes (20)
ATOMIC
Establish the location for a fence, and gather information needed to ensure that there are no electric cables or water lines in the area.
ATOMIC
Set metal or wooden posts in upright positions in postholes.
ATOMIC
Measure and lay out fence lines and mark posthole positions, following instructions, drawings, or specifications.
ATOMIC
Align posts, by lines or sighting, and verify vertical alignment of posts, using plumb bobs or spirit levels.
ATOMIC
Attach rails or tension wire along bottoms of posts to form fencing frames.
ATOMIC
Dig postholes, using spades, posthole diggers, or power-driven augers.
ATOMIC
Attach fence rail supports to posts, using hammers and pliers.
ATOMIC
Assemble gates, and fasten gates into position, using hand tools.
ATOMIC
Mix and pour concrete around bases of posts, or tamp soil into postholes to embed posts.
ATOMIC
Make rails for fences, by sawing lumber or by cutting metal tubing to required lengths.
ATOMIC
Nail top and bottom rails to fence posts, or insert them in slots on posts.
ATOMIC
Discuss fencing needs with customers, and estimate and quote prices.
ATOMIC
Stretch wire, wire mesh, or chain link fencing between posts, and attach fencing to frames.
ATOMIC
Complete top fence rails of metal fences by connecting tube sections, using metal sleeves.
ATOMIC
Erect alternate panel, basket weave, and louvered fences.
ATOMIC
Insert metal tubing through rail supports.
ATOMIC
Nail pointed slats to rails to construct picket fences.
ATOMIC
Construct and repair barriers, retaining walls, trellises, and other types of fences, walls, and gates.
ATOMIC
Weld metal parts together, using portable gas welding equipment.
ATOMIC