Back to Explore
TASK

Solar Thermal Installers and Technicians

ID

work_construction/solar_thermal_installers_and_technicians

Type

TASK

Children

21

Child Nodes (21)

ATOMIC

Test operation or functionality of mechanical, plumbing, electrical, and control systems.

ATOMIC

Apply weather seal, such as pipe flashings and sealants, to roof penetrations and structural devices.

ATOMIC

Install solar collector mounting devices on tile, asphalt, shingle, or built-up gravel roofs, using appropriate materials and penetration methods.

ATOMIC

Install copper or plastic plumbing using pipes, fittings, pipe cutters, acetylene torches, solder, wire brushes, sand cloths, flux, plastic pipe cleaners, or plastic glue.

ATOMIC

Identify plumbing, electrical, environmental, or safety hazards associated with solar thermal installations.

ATOMIC

Demonstrate start-up, shut-down, maintenance, diagnostic, and safety procedures to thermal system owners.

ATOMIC

Install circulating pumps using pipe, fittings, soldering equipment, electrical supplies, and hand tools.

ATOMIC

Install flat-plat, evacuated glass, or concentrating solar collectors on mounting devices, using brackets or struts.

ATOMIC

Install solar thermal system controllers and sensors.

ATOMIC

Fill water tanks and check tanks, pipes, and fittings for leaks.

ATOMIC

Design active direct or indirect, passive direct or indirect, or pool solar systems.

ATOMIC

Determine locations for installing solar subsystem components, including piping, water heaters, valves, and ancillary equipment.

ATOMIC

Perform routine maintenance or repairs to restore solar thermal systems to baseline operating conditions.

ATOMIC

Install heat exchangers and heat exchanger fluids according to installation manuals and schematics.

ATOMIC

Apply operation or identification tags or labels to system components, as required.

ATOMIC

Connect water heaters and storage tanks to power and water sources.

ATOMIC

Cut, miter, and glue piping insulation to insulate plumbing pipes and fittings.

ATOMIC

Install plumbing, such as dip tubes, port fittings, drain tank valves, pressure temperature relief valves, or tanks, according to manufacturer specifications and building codes.

ATOMIC

Install monitoring system components, such as flow meters, temperature gauges, and pressure gauges, according to system design and manufacturer specifications.

ATOMIC

Assess collector sites to ensure structural integrity of potential mounting surfaces or the best orientation and tilt for solar collectors.

ATOMIC

Apply ultraviolet radiation protection to prevent degradation of plumbing.