Back to Explore
TASK

Tile and Stone Setters

ID

work_construction/tile_and_stone_setters

Type

TASK

Children

25

Child Nodes (25)

ATOMIC

Align and straighten tile using levels, squares, and straightedges.

ATOMIC

Finish and dress the joints and wipe excess grout from between tiles, using damp sponge.

ATOMIC

Cut and shape tile to fit around obstacles and into odd spaces and corners, using hand and power cutting tools.

ATOMIC

Determine and implement the best layout to achieve a desired pattern.

ATOMIC

Mix, apply, and spread plaster, concrete, mortar, cement, mastic, glue or other adhesives to form a bed for the tiles, using brush, trowel and screed.

ATOMIC

Study blueprints and examine surface to be covered to determine amount of material needed.

ATOMIC

Measure and mark surfaces to be tiled, following blueprints.

ATOMIC

Lay and set mosaic tiles to create decorative wall, mural, and floor designs.

ATOMIC

Apply mortar to tile back, position the tile, and press or tap with trowel handle to affix tile to base.

ATOMIC

Mix and apply mortar or cement to edges and ends of drain tiles to seal halves and joints.

ATOMIC

Apply a sealer to make grout stain- and water-resistant.

ATOMIC

Level concrete and allow to dry.

ATOMIC

Measure and cut metal lath to size for walls and ceilings, using tin snips.

ATOMIC

Install and anchor fixtures in designated positions, using hand tools.

ATOMIC

Prepare surfaces for tiling by attaching lath or waterproof paper, or by applying a cement mortar coat to a metal screen.

ATOMIC

Remove and replace cracked or damaged tile.

ATOMIC

Cut tile backing to required size, using shears.

ATOMIC

Remove any old tile, grout and adhesive using chisels and scrapers and clean the surface carefully.

ATOMIC

Cut, surface, polish, and install marble and granite or install pre-cast terrazzo, granite or marble units.

ATOMIC

Spread mastic or other adhesive base on roof deck to form base for promenade tile, using serrated spreader.

ATOMIC

Assist customers in selection of tile and grout.

ATOMIC

Prepare cost and labor estimates, based on calculations of time and materials needed for project.

ATOMIC

Brush glue onto manila paper on which design has been drawn and position tiles, finished side down, onto paper.

ATOMIC

Select and order tile and other items to be installed, such as bathroom accessories, walls, panels, and cabinets, according to specifications.

ATOMIC

Build underbeds and install anchor bolts, wires, and brackets.